Handy links to every article the Blackout report has published about the 9 August 2019 blackout.
Read More “9 August 2019 Blackout – Everything You Need To Know” »
What happens when there is no power?
Handy links to every article the Blackout report has published about the 9 August 2019 blackout.
Read More “9 August 2019 Blackout – Everything You Need To Know” »
Exploring the role inertia plays in our electricity system and whether the transition to zero-carbon generation could pose problems.
Read More “What Role Does Inertia Play In A Modern Power Grid?” »
10-point action plan included in the E3C final report into 9 August blackout emphasises need to improve UK’s power resilience.
Read More “9 August Blackout – E3C Final Report & Future Recommendations” »
A major investigation into the 9 August blackout questions whether National Grid’s contingency plans for such a significant loss of power are “fit for purpose”.
National Grid’s final technical report into August’s blackout calls for review into whether the network has enough backup power to cope with similar incidents.
Read More “9 August Blackout – National Grid’s Full Technical Report & Recommendations” »